SHEET DSVG-100 · WORKSWEB EDITION

Schedule of works

Sixteen installation packages, one accountable site team. System selection is led by the project design team — DSVG installs to the specified system's technical requirements, including refurbishment and fire remediation works.

PRIMARY FAÇADE SYSTEMS

W-03

Unitised curtain walling

Factory-assembled units craned and set panel-by-panel.

INSTALLED — SCHUECO SYSTEM · NEWINGTON CAUSEWAY
W-04

Stick curtain walling

Site-assembled framing for complex geometries.

INSTALLED — STRATFORD EDGE
W-08

Rainscreen cladding

Hook-on and hidden-fix systems over ventilated cavities.

INSTALLED — TERRACOTTA · NEWINGTON CAUSEWAY
W-09

Stone cladding

Natural stone façade installation.

W-10

GRC cladding

Glassfibre reinforced concrete panels.

INSTALLED — BATTERSEA PHASE 4A · KING’S ROAD PARK
W-14

Precast cladding

Precast concrete façade elements, including glazing into precast.

INSTALLED — BATTERSEA 4A · BBC TVC PRECAST (BE)

FENESTRATION & STRUCTURAL

W-01

Aluminium doors & windows

Fenestration installed and weathered to programme.

INSTALLED ACROSS UK, BELGIUM & NETHERLANDS
W-02

Glazing

Structural and infill glazing packages, including cross-track glazing.

INSTALLED — LONDON BRIDGE STATION
W-05

Balustrades

Glazed and framed edge protection systems.

W-07

SFS structural façade systems

Steel framing behind the envelope.

INSTALLED — EMBASSY GARDENS · OLYMPIC MEDIA BUILDING

ENVELOPE CLOSURES & RENDERS

W-06

Soffits

Architectural soffit linings and closures.

W-11

Louvres

Ventilation, screening and acoustic louvres.

W-12

Gutter systems

Envelope drainage and rainwater goods.

W-13

Flashings

Weatherproofing closures and interfaces.

W-15

EWI rendering

External wall insulation and render systems.

W-16

Refurbishment & fire remediation

Envelope refurbishment and fire remediation works.

Programme & sequencing

How a DSVG installation package typically integrates with a main contractor's programme. Sequencing is agreed per project against the master programme.

  1. PRE-CONTRACT

    Tender support

    Buildability input, interface review and installation methodology at pricing stage.

  2. MOBILISATION

    Survey & setting out

    Survey, setting-out checks, logistics plan, crane and hoist coordination.

  3. INSTALLATION

    To floor-cycle programme

    Specialist site teams install to floor-cycle programme — unitised panels, rainscreen zones and secondary packages sequenced to weathertight milestones.

  4. CLOSE-OUT

    Handover

    Interface closures, flashings and gutters, inspection records and handover documentation.

SECTORS — RESIDENTIAL · HIGH-RISE RESIDENTIAL · COMMERCIAL · EDUCATION · HEALTHCARE · AIRPORTS & TRANSPORT · INDUSTRIAL